D DaDe Stamping
Manufacturing cases

Real parts made on our presses. Materials, tolerances, lead times — exactly what shipped.

A selection of stamping, machining and finishing work we have run in the last 12 months. Customer names are anonymized per NDA; the materials, processes, tolerances and lead times are exactly what shipped on those runs.

Agriculture case study

Agricultural Tractor Bracket — SPCC 3.0 mm, Stamping + Zinc Plating, 80,000 pcs/yr

Agriculture

Agricultural Tractor Bracket

Outdoor corrosion-resistant mounting bracket for a US OEM tractor maker.

Material
SPCC 3.0 mm
Process
Stamping + Zinc Plating
Volume
80,000 pcs/yr
Lead time
18 business days
Water Pump case study

Solar Pump Mounting Plate — SPCC 2.5 mm, Stamping + Welding + Painting, 30,000 pcs/yr

Water Pump

Solar Pump Mounting Plate

Pump base plate for solar-powered irrigation systems.

Material
SPCC 2.5 mm
Process
Stamping + Welding + Painting
Volume
30,000 pcs/yr
Lead time
20 business days
Sensor case study

Industrial Sensor Housing — SECC 1.5 mm, Stamping + Bending + Nickel Plating, 120,000 pcs/yr

Sensor

Industrial Sensor Housing

Tight-tolerance housing for vehicle detection sensors.

Material
SECC 1.5 mm
Process
Stamping + Bending + Nickel Plating
Volume
120,000 pcs/yr
Lead time
15 business days
Auto Aftermarket case study

Brake Shim Plate — 65Mn 1.2 mm, Fine Blanking + Heat Treatment, 500,000 pcs/yr

Auto Aftermarket

Brake Shim Plate

High-volume shim for a North American brake kit brand.

Material
65Mn 1.2 mm
Process
Fine Blanking + Heat Treatment
Volume
500,000 pcs/yr
Lead time
25 business days
Heating case study

Wood Stove Door Latch — SPCC 4.0 mm, Stamping + Blackening, 15,000 pcs/yr

Heating

Wood Stove Door Latch

High-temperature-resistant latch for a Canadian wood stove OEM.

Material
SPCC 4.0 mm
Process
Stamping + Blackening
Volume
15,000 pcs/yr
Lead time
22 business days
Fitness case study

Fitness Equipment Bracket — Q235 5.0 mm, Stamping + Powder Coating, 40,000 pcs/yr

Fitness

Fitness Equipment Bracket

Structural bracket for a home gym machine.

Material
Q235 5.0 mm
Process
Stamping + Powder Coating
Volume
40,000 pcs/yr
Lead time
18 business days
HVAC case study

HVAC Damper Frame — Galvanized 1.2 mm, Stamping + Assembly, 60,000 pcs/yr

HVAC

HVAC Damper Frame

Damper frame for a European HVAC distributor.

Material
Galvanized 1.2 mm
Process
Stamping + Assembly
Volume
60,000 pcs/yr
Lead time
16 business days
Appliance case study

Appliance Control Bracket — CRS 2.0 mm, Stamping + Zinc Plating, 100,000 pcs/yr

Appliance

Appliance Control Bracket

Control panel bracket for a major small-appliance brand.

Material
CRS 2.0 mm
Process
Stamping + Zinc Plating
Volume
100,000 pcs/yr
Lead time
17 business days

Representative work. Customer names anonymized per NDA. Materials, processes, tolerances and lead times shown are exactly what shipped on these runs.

Your part could be the next case study.

Send your drawing — we''ll quote within 1 business day.

Upload Your Drawing →